| June 27, 2002 - Deck/Floor Day |
| The day started off with putting in the floor joists for the deck and floor of the observatory. Here the first one is being leveled off. |
 |
 |
A shot of the three floor joists installed and leveled. |
| An images of the key hole in the concrete that was poured the other day. It took a little bit of prying to get it out, put it is out. |
 |
 |
The final check with the plum bob to ensure that the deck in perfectly centred on the future pier. |
| And the process of laying in the boards for the floor begins. The front section of the deck will form a short deck that is outside the actual observatory. |
 |
 |
Attaching boards to the top of the deck. |
| Still working on the deck. |
 |
 |
Putting shorter sections of deck in place that will be hidden inside the observatory by the plywood floor. |