July 23-25, 2002
We started off with putting in the plywood floor. The main pieces are four foot wide boards that have been cut in half. The pier is still isolated from the floor by leaving a gap.
We took the dome structure apart and re-assembled it up on top of the walls. Here is one shot that gives an idea of scale.
Here is a close up of the dome on top of the walls.

Previous Home Next