| August 6-8, 2002 | |
| Putting on one of the early gores. | ![]() |
![]() |
Half of the gores on. |
| Attaching the last gore. | ![]() |
![]() |
A shot of the observatory from a distance with all of the gores on. |
| All of the gores on, looking at the observatory from the front. The last two wall panels and the door still need to be installed. | ![]() |
![]() |
A shot looking up through the slit. |
| Previous | Home | Next |